Mine Planning & Scheduling

Elytica-01.png

Mine Planning & Scheduling

 

MineRP has a proud history of developing reliable, yet cutting edge solutions to optimise the process of mine planning and scheduling. With specified functionality developed for most mining methods including underground and open cut mines, we are the provider of choice to mines around the globe.

 

Recent developments focused on the creation of new-generation mine planning and design systems natively running on SpatialDB as well as combining best in class functionalities from our current generation CADSMine, Mine2-4D and EPS products into newly architectured solution building blocks.

MineRP Planner

MineRP Planner, built on MineRP's Enterprise Spatial Integration Framework, revolutionizes Rapid Long & Medium Term Mine Planning.

Whether for green- or brown fields operations, mine planning across any time horizon is time consuming and laborious.  This means mines are typically able to create and assess only one mine plan per annual planning cycle. Manually drawing CAD mine designs to be sequenced and scheduled is the major bottleneck, and the handover between design and financial costing & budgeting is spreadsheet hell.

Framework based planning with MineRP Planner transforms mine planning, and dramatically reduces the process time for mine design, sequence and scheduling activities. Traditional design by CAD drawing is replaced by automated framework based design,providing the opportunity to create and examine many more business alternatives.

 

MineRP Planner gives miners the flexibility to make large scale or incremental adjustments in response to market trends within the window of opportunity presented.

Major functional elements of MineRP Planner includes:

  • Template Aided Design capabilities allowing for the fast generation of mine design alternatives for evaluation, scheduling and final selection

  • Long and Short term planning at the level of detail of your choice

  • Improved design tools specific to each mining method and orebody type

  • Optimized evaluation engine for performing evaluation on the fly for a subset of the design data during active designs

  • Evaluation engine optimised to perform bulk evaluation for calculating tons, content and attribute values (including calculated values) as defined in the evaluation standard

  • Resourcing and scheduling tools for mining activities according to the mine design and sequencing, including optimisation and leveling.

     

     

 
 

MineRP CAD

MineRP CAD is core to the Spatial Integration Platform offered by MineRP. 

 

This solution building block has two major applications in this context.  Firstly, it acts as an integrated view into all datasets hosted by MineRP systems through a CAD like database environment as configured by MineRP Core, including externally referenced data, predefined views, layouts and predefined EAV & spatial filters. 

 

The second major application of MineRP CAD centres on its CAD capabilities as such.  Based on AutoCAD technology, MineRP CAD is a modern, fully functional CAD tool extended with industry-specific mining tools optimised for efficient and accurate design and draughting work. 

 

A major differentiator of MineRP CAD is the fact that it interacts directly with SpatialDB, and does not proliferate proprietary CAD files, but rather extends the features of SpatialDB to offer seamless versioning, collaboration and multi-disciplinary information sharing.

Mine2-4D v15

Mine2-4D v15 is the new benchmark in mine planning software, offering mine planners significant advances in planning and scheduling efficiency. Users can now perform key functions in fewer clicks due to streamlined process flows and save hours of calculation time with the instant sequencing capability.

 

 

The result of a complete system redesign, Mine2-4D v15 offers a more logical, standardised and satisfying user experience by replacing aging technology, refining and enhancing key functionality and incorporating extensive global client feedback.

 

 

Benefits

 

  • Produce detailed long and short term mine plans

  • Improve planning and scheduling efficiency

  • Visualise designs and schedules in graphical terms

  • Create the best possible mining schedule through rapid scenario analysis

 

Features

 

  • New graphics engine and redesigned menu interfaces

  • Windows 7 compliance and 64-bit architecture

  • Database as opposed to file-based information storage

  • Isolated identification and processing of new changes

  • Ability to use external wireframes for evaluation and scheduling

  • Improved handling of third party design data

  • Tighter integration with MineRP's Enhanced Production Scheduler (EPS)

  • Technological alignment with MineRP enterprise offerings

 

 

 
 

EPS

EPS sets the industry standard for mine production scheduling and forecasting. Short for Enhanced Production Scheduler, EPS addresses the shortcomings of traditional project scheduling and spread sheet based solutions by providing a logical and unified approach to mine scheduling. 

 

Integrated with many design tools such as Mine2-4D and EPSViz, users can interactively update schedules, rules, dependencies other features as they toggle between design, schedule and visualisation.

 

With EPS, you get:

 

  • Gantt chart capability, with associated time-based crosstab or histogram reports.

  • Many familiar project management and scheduling tools, yet fully customised for the needs and complex issues of mining operations.

  • A modern user interface, making it extremely easy-to-learn and easy-to-use application.

MAJOR EPS FEATURES

 

Project Setup

 

  • Import data from (or export data to) external spread sheet sources, such as Microsoft Excel

  • Create user-defined physical properties such as grade, tonnage, meters, and cost 

  • Define labour and equipment resources and assign these to specific activities 

  • Specify resources as either rate, duration, or effort driven

  • Import data from (or export data to) external spreadsheet sources, such as Microsoft Excel

 

 

Tasks 

 

  • Specify Tasks as either rate or duration driven 

  • Colour-code activities to allow quick and easy differentiation on a user-defined basis 

  • Set target ranges for all user-defined properties for production planning 

  • Change the rate of a task over time 

  • Record actual start and finish dates, and track percentage-complete for activities 

  • Change the Gantt Chart display to show date bars, cross tab values, or both

  • Specify Tasks as either rate or duration driven 

 

 

Resources

 

  • Define resources as either equipment or labour, and assign them to activities 

  • Build a Resource Based Schedule and change availability and cost over time 

  • Level resources using the improved levelling algorithm, which takes into account resource calendars and provides for multi-resource utilization on a single task 

  • View resources and tasks assigned to them on the assignment bar chart

 

 

Operation

 

  • Edit the bar chart period values in-line in a similar manner to a spreadsheet

  • Capture notes on project, tasks, and resources, and add hyperlinks in the notes fields

  • Indicators (icons in the information column) indicate the status of Tasks and Resources

  • Create filters to build customized views in the Gantt Chart area and to use in Cross tab reporting

  • Filter and sort tasks on any field or combination of fields

  • Automatically generate Task filters based on unique field values

  • Link tasks (create dependencies) and automatically calculate the schedule from these dependencies.

  • Colour these dependencies based on dependency groups

  • Create histograms in the Cross tab for graphical representation of data

  • Build basic financial plans through revenue and cost fields

  • Track revenue and costs over time

 

 

Calendars

 

  • Maintain separate scheduling and reporting calendars, with the ability to report data over any given time period 

  • Schedule holidays and shut-down periods, and display these in the Gantt Chart area 

  • Assign calendars to activities and resources

 

 

 

 

Dynamic 3D Visualization—EPSViz

 

  • Link the EPS schedule with 3D graphical data to provide dynamic animations of the schedule 

  • Interactively select 3D activities 

  • Distribute visualizations and schedules to non-licensed users of the software using the free 

  • Viewer versions available for download from the web

 

EPSViz

EPS Viz provides the ability to link an EPS Gantt schedule with 3D graphical design data to provide dynamic and interactive animations of the schedule, and a whole lot more!

 

 


With EPS Viz, you also get:

 

Instant Visual Feedback

 

  • Instantly see designs in 3D while scheduling • Changes created in EPS are visually displayed in EPS Viz 

  • Interactively select tasks in EPS, and EPS Viz will synchronise and display your selection visually - and vice-versa!

 

Improved Data Filtering

 

  • Filters in EPS are visually reproduced in EPS Viz

  • Considerable Time Savings

  • Visually link designs by only using EPS and EPS Viz 

  • Reduce the need to re-synchronise the EPS schedule back to Mine2-4D in order to see the schedule animation

 

Improved Schedule Time Reporting

 

  • See the designs happening at different time periods 

  • EPS timescales update the EPS Viz animation instantly

  • Reduced Data Requirements

  • No need for Mine2-4D project files – you only need the EPS and wireframe files

EPSViz FUNCTIONALITY

 

 

Interactive Scheduling

 

Select a task in EPS Viz and have it auto-highlighted in the EPS Gantt chart, or do it the other way round by selecting tasks on the EPS Gant Chart, and letting EPS Viz highlight the task in the design visualisation window.

 

Clipping & Selection

 

Filter out regions of data based on:

  • Box clipping or 

  • Path Clipping

 

 

Presentation

 

Create text, display annotation, or display messages during the animation

 

 

 

 

Legends

 

  • Define multiple legends with user-defined colours based on value or range

  • Select attribute on which to create legend from picklist

  • Display legend table within animation view

 

 

 

Recolor & Set Transparency

 

Re-colour  and set the transparency on the designs

 

 

 

 

Split Wireframes

 

Split the wireframes according to attributes

 

 

 

 

 

Additional Wireframes

 

Load more wireframes (i.e. geology, as-builts, etc) in the schedule

 

 

 

 

 

Animate and Export

 

  • Save the new design animation file (.moz) and quickly send through email, create video files (.avi) of the animations, or quickly save screen captures

  • Easily export wireframe and string files created from EPS Viz

     

     

     

Elytica

Successfully navigating a business through economic uncertainty requires split-second data-driven

decision-making.

 

The Elytica platform simplifies the integration of data sciences with cloud-based optimization technology to provide online decision-support as a 24/7 service.

The unique approach followed by Elytica to capture business logic and operational complexities within a natural-language-like computing environment, allows us to spend more time understanding your business problem and adding immediate value.

 